King post wall
King post walls contain main columns (king posts) installed in equal spaces at a few metres, along the line of a retaining wall, the space in between is filled with concrete panels, blocks or stone and acts as a retaining wall. Specification for king postwalls can be found in the British standards or Eurocode 7 for temporary or permanent conditions.
Generally the king posts are driven into the ground, thus also referred to as king piles, and connected with a beam, to form H shapes, as such one might refer to the lower half as king piles and the upper half as king posts. The upper part of the H structure is normally then in filled with precast concrete panels and may sit above ground, as was the case in the earlier designs used in the construction of the Berlin wall (also sometime used to describe this construction method). The same design approach may also be entirely back filled and located underground for the construction of retaining walls, often referred to as king post piles, or pile walls, soldier walls or just retaining walls.
[edit] Related articles on Designing Buildings
- Bearing capacity.
- Building foundations.
- Compensated foundation.
- Continuous flight auger piles.
- Driven piles.
- Footings.
- Geothermal pile foundations.
- Ground anchor.
- King post.
- Micropiles.
- Pad foundation.
- Pile foundations.
- Principles of foundations.
- Raft foundation.
- Rubble trench foundation.
- Screw pile foundations.
- Stepped foundation.
- Strip foundation.
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.